Leading Edge Materials Corp
Commodity exposure Graphite no daily quote·NdPr oxide no daily quote
Our partners
Overview
Leading Edge Materials Corp is a Canadian-headquartered company with graphite and rare earth element projects in Sweden, including the Norra Kärr project.
Projects 2
| Project | Country | Commodity | Region |
|---|---|---|---|
| Norra Kärr | Sweden | REE | JönköpingJönköping |
| Woxna | Sweden | Graphite |
Drilling programmes 1
| Logo | Project | Purpose | Metres done / planned | Holes | Started | Status | Contractor |
|---|---|---|---|---|---|---|---|
![]() | Woxna | Exploration | 469 m drilled | 5 | 8 Sep 2026 | Completed | not disclosed |
Financings 2
| Type | Amount | Price | Discount | Announced | Lead manager | Release |
|---|---|---|---|---|---|---|
| Units with warrants | €3.7 millionCAD 6.0 million | 0.25CAD | 15.3 %calculated | 12 Jul 2026 | not disclosed | Read release |
| Units with warrants | €1.8 millionCAD 2.8 million | 0.16CAD | 17.9 %calculated | 10 Jun 2025 | not disclosed | Read release |
Latest news

Leading Edge Materials Corp · TSXV: LEMLeading Edge Materials completes near-mine drilling at Woxna graphite project
Leading Edge Materials Corp. (TSXV: LEM) announced the completion of a five-hole, 469.3-metre first-pass diamond drilling programme at the Woxna Graphite mine in Sweden, designed to test whether graphite occurrences at Kringeltjärn, Råttjärnamyren and Svartboberget form part of a larger system surrounding the existing Kringelgruvan mine. The programme ran from 8 September to 3 November 2026. Graphite was observed in all five holes, with graphite-bearing intervals intersected in four of them. At Kringeltjärn East, hole 26DDKRI004 returned two graphite-bearing intervals of 13.4 metres (26.20–39.60 m) and 11.73 metres (52.32–64.05 m) down-hole, with larger flakes observed in the lower interval. At Råttjärnamyren, hole 26DDKRI003 intersected multiple graphite-bearing intervals from 76.0 metres down-hole, shallower than anticipated, supporting the interpretation of a relatively shallow-dipping unit extending towards Svartboberget.
Source: leadingedgematerials.com — read the original

Leading Edge Materials Corp · TSXV: LEMLeading Edge Materials commences EIA for Norra Kärr project
Leading Edge Materials Corp (TSXV: LEM) announced that its wholly owned Swedish subsidiary Greenna Mineral AB has commenced work on the Environmental Impact Assessment for the Norra Kärr Heavy Rare Earth Elements Project in Sweden. Swedish environmental consultancy Ecogain has been appointed to support the EIA process and the studies required for environmental permitting. The EIA will form the basis of an application for an environmental permit under the Swedish Environmental Code, planned for submission during 2027. Initial work will focus on a nature value inventory and preliminary studies, with the scope of further investigations to be determined through consultation with authorities, local communities and other stakeholders. The EIA follows the award of a 25-year Exploitation Concession by the Swedish Government in June 2026.
Source: mfn.se — read the original

Leading Edge Materials Corp · TSXV: LEMLeading Edge Materials signs MoU with Trilliun for Norra Kärr co-products
Leading Edge Materials Corp (TSXV: LEM) announced that its wholly owned Swedish subsidiary GREENNA Mineral AB has signed a non-binding Memorandum of Understanding with TRILLIUN Resources Pte. Ltd. covering proposed cooperation on industrial mineral co-products from the Norra Kärr Heavy Rare Earth Elements Project in Sweden. Under the framework, GMAB intends to supply nepheline syenite and aegirine to Trilliun for processing and marketing to industrial customers in glass, ceramics, fillers and related sectors. The first phase covers technical data sharing, testwork and a joint technical committee to define a mineral processing pathway, with a definitive Sale and Purchase Agreement as a possible next step.
Source: mfn.se — read the original

Leading Edge Materials Corp · TSXV: LEMLeading Edge Materials closes C$6,000,000 private placement
Leading Edge Materials Corp. (TSXV: LEM) announced the closing of the third and final tranche of its previously announced private placement, issuing 6,868,000 common shares at C$0.25 per share for gross proceeds of CAD 1,717,000. Together with the first and second tranches, the company has issued an aggregate of 24,000,000 units at C$0.25 per share for aggregate gross proceeds of C$6,000,000. Each unit consists of one common share and one warrant exercisable at C$0.40 per share for two years from the closing date. Proceeds will support Pre-Feasibility Study workstreams and environmental permitting at the Norra Kärr Heavy Rare Earth Elements Project in Sweden, studies related to a possible restart of the Woxna Graphite mine and processing plant, and general working capital. Director Eric Krafft subscribed for 5,468,000 units under the placement and following the transaction beneficially holds approximately 40.52% of the issued and outstanding common shares on a non-diluted basis.
Source: mfn.se — read the original

Leading Edge Materials Corp · TSXV: LEMLeading Edge Materials reports Q2 2026 loss and closes private placement tranche
Leading Edge Materials Corp. (TSXV: LEM) announced financial results for the three months ended April 30, 2026, reporting a net loss of C$1,357,598 compared to C$1,179,168 in the same period of the prior year. The increase was attributed primarily to share-based compensation of C$804,590. As of April 30, 2026, the company held working capital of C$539,488, an accumulated deficit of C$54,672,768, and total assets of C$29,852,958. Management noted the company lacked sufficient financial resources to fund operations for the next twelve months and was pursuing additional financing. The company also closed a second tranche of a private placement and noted the Mining Inspectorate's March 2026 recommendation to approve the Norra Kärr Exploitation Concession application, now awaiting a final Swedish Government decision.
Source: leadingedgematerials.com — read the original

Leading Edge Materials Corp · TSXV: LEMLeading Edge Materials commences five-hole graphite drilling at Woxna
Leading Edge Materials Corp. (TSXV: LEM) announced it has commenced a first-pass diamond drilling programme at its 100%-owned Woxna Graphite Project in Sweden. The five-hole programme is designed to test whether the Kringeltjärn, Råttjärnamyren and Svartboberget graphite occurrences form part of the same larger regional graphite-bearing system. The hypothesis is supported by a historical drillhole at Svartboberget that intersected a thick sequence of graphite-bearing rock at depth, and by conductive trends identified in Slingram electromagnetic data from the 1980s and 1990s. The company also announced an extension to its non-brokered private placement closing, now expected on or before September 25, 2026, with terms unchanged.
Source: leadingedgematerials.com — read the original
Summaries are generated automatically from press releases. Not investment advice.


