
Denmark
Denmark has no metal mining and has had none in modern times. Its subsoil has been worked for chalk, clay, gravel and sand, and its geology — thick sedimentary cover over a deep basement — offers little a hard-rock explorer would licence.
At a glance
- Capital
- Copenhagen
- Population
- 6.0 million 2026 est., IMF
- Currency
- DKK
- EU / EEA
- EU
- GDP per capita
- US$82,714 2026 est., IMF
- Head of government
- Mette Frederiksen — Social Democrat-led coalition (S, V, M) (as of Mar 2026)
- Next election
- by Oct 2026 (parliamentary)
Population and GDP per capita: IMF World Economic Outlook (October 2026), pulled 1 Nov 2026
Mining climate
- Investment attractiveness
- Not surveyed
- Policy perception
- Not surveyed
- Previous survey
- Not surveyed (2024)
- Active mines
- 0
- Main commodities mined
- No metal mining
- Permitting authority
- Energistyrelsen (Subsoil Act)
- Geological survey
- GEUS
Ranks: Fraser Institute Annual Survey of Mining Companies 2025 (Feb 2026) , 68 jurisdictions ranked in 2025.
Denmark has no metal mining and has had none in modern times. Its subsoil has been worked for chalk, clay, gravel and sand, and its geology — thick sedimentary cover over a deep basement — offers little a hard-rock explorer would licence.
What Denmark has is a role in the rest of the region. The Geological Survey of Denmark and Greenland (GEUS) serves Greenland as well, and much of the mapping, geophysics and core underpinning Greenlandic exploration is held and published from Copenhagen. Danish law still touches Greenlandic licensing where foreign and security policy is engaged.
Within Denmark, the Danish Energy Agency (Energistyrelsen) administers the subsoil under the Subsoil Act; permits for aggregates, the only extraction of any scale, are issued regionally.
Denmark appears in this directory for the Greenland connection and for the Danish companies holding ground elsewhere in the Nordics, not for domestic mining. The Fraser Institute does not survey it.
Companies
Projects
Active drilling programmes
News from Denmark

GreenRoc Strategic Materials plc · AIM: GROCGreenRoc completes Phase III drilling at Amitsoq graphite project
GreenRoc Strategic Materials plc (AIM: GROC) announced the completion of its Phase III diamond drilling programme at the Amitsoq graphite project in Greenland and reported receipt of the purification line for its pilot plant in Hørsholm, Denmark.
Source: investegate.co.uk — read the original

GreenRoc Strategic Materials plc · AIM: GROCGreenRoc reports 95.2% graphite concentrate from Amitsoq test work
GreenRoc Strategic Materials plc (AIM: GROC) announced results from processing test work on a representative 300 kg subsample of the 20-tonne bulk sample collected from the Amitsoq graphite project in Greenland. SGS Lakefield in Canada crushed the subsample to less than 3.35 mm, conducted 20 flotation tests and a locked-cycle test, yielding a concentrate grading 95.2 wt.% graphite with overall recovery of more than 90%; the sample's graphite content was determined to be 22.3 wt.%. GreenRoc also signed an agreement with GTK Mintec in Finland to process the full 20-tonne sample, with results including several tonnes of graphite concentrate expected before end of 2026. Phase III drilling, paused through September, is scheduled to resume around 1 October 2026, with the final two holes planned for completion by 16 October 2026.
Source: investegate.co.uk — read the original

GreenRoc Strategic Materials plc · AIM: GROCGreenRoc reports Phase III drill results and pilot plant update at Amitsoq
GreenRoc Strategic Materials plc (AIM: GROC) provided an update on its Amitsoq Project in Greenland and its active anode materials pilot plant in Denmark. The company states that most of the equipment for the purification line at its pilot plant in Hørsholm, Denmark was packed into containers on 12 August 2026 at Sepor Inc's premises in Florida, USA, and is expected to arrive by the end of September 2026; the purification line includes reactor tanks, rinse tanks, slurry pumps, baking ovens, fume scrubber and drying ovens, and was developed by Sepor in accordance with instructions from GreenRoc and its technical advisory partner, ProGraphite GmbH.
Source: investegate.co.uk — read the original
Summaries are generated automatically from press releases. Not investment advice.
Authorities
| Logo | Organisation | Role | Website | Contact |
|---|---|---|---|---|
![]() | GEUSGeological Survey of Denmark and Greenland | Geological Survey | geus.dk | Contact |
| EnergistyrelsenDanish Energy Agency — subsoil authority | Mining Inspectorate / permitting authority | ens.dk | Contact | |
| MiljøstyrelsenDanish Environmental Protection Agency | Environmental authority | mst.dk | Contact | |
![]() | RegionerneDanish Regions — raw materials permits | Land / regional authority | regioner.dk | Contact |
![]() | UdenrigsministerietMinistry of Foreign Affairs of Denmark (investment screening) | Other | um.dk | Contact |





