
Company news
Automated summaries of press releases from companies in the directory, with a link to the original announcement. Summaries are automated. Not investment advice.
Our partners

GreenRoc Strategic Materials plc · AIM: GROCGreenRoc completes Phase III drilling at Amitsoq graphite project
GreenRoc Strategic Materials plc (AIM: GROC) announced the completion of its Phase III diamond drilling programme at the Amitsoq graphite project in Greenland and reported receipt of the purification line for its pilot plant in Hørsholm, Denmark.
Source: investegate.co.uk — read the original

GreenRoc Strategic Materials plc · AIM: GROCGreenRoc reports 95.2% graphite concentrate from Amitsoq test work
GreenRoc Strategic Materials plc (AIM: GROC) announced results from processing test work on a representative 300 kg subsample of the 20-tonne bulk sample collected from the Amitsoq graphite project in Greenland. SGS Lakefield in Canada crushed the subsample to less than 3.35 mm, conducted 20 flotation tests and a locked-cycle test, yielding a concentrate grading 95.2 wt.% graphite with overall recovery of more than 90%; the sample's graphite content was determined to be 22.3 wt.%. GreenRoc also signed an agreement with GTK Mintec in Finland to process the full 20-tonne sample, with results including several tonnes of graphite concentrate expected before end of 2026. Phase III drilling, paused through September, is scheduled to resume around 1 October 2026, with the final two holes planned for completion by 16 October 2026.
Source: investegate.co.uk — read the original

GreenRoc Strategic Materials plc · AIM: GROCGreenRoc reports Phase III drill results and pilot plant update at Amitsoq
GreenRoc Strategic Materials plc (AIM: GROC) provided an update on its Amitsoq Project in Greenland and its active anode materials pilot plant in Denmark. The company states that most of the equipment for the purification line at its pilot plant in Hørsholm, Denmark was packed into containers on 12 August 2026 at Sepor Inc's premises in Florida, USA, and is expected to arrive by the end of September 2026; the purification line includes reactor tanks, rinse tanks, slurry pumps, baking ovens, fume scrubber and drying ovens, and was developed by Sepor in accordance with instructions from GreenRoc and its technical advisory partner, ProGraphite GmbH.
Source: investegate.co.uk — read the original
Summaries are generated automatically from company press releases. Not investment advice.


