Topic: Drill results

  1. Arctic Minerals reports high-grade Cu-Ag intersections at Hennes Bay

    Arctic Minerals AB (Nasdaq First North: ARCT) announced assay results from its maiden drilling programme (DP1) at the Hennes Bay copper-silver project in Sweden, reporting the best intersections recorded to date at the project. The twelve-hole, 4,187 m programme — all drilled outside the current Mineral Resource Estimate — returned 64.4 m at 1.3% CuEq (1.08% Cu and 27 g/t Ag), including 1.7 m at 3.18% CuEq (2.1% Cu and 130 g/t Ag) at the Henneviken prospect. Other select intersections include 7.95 m at 1.55% CuEq at Henneviken, 3.14 m at 1.12% CuEq at Dingelvik and 2.80 m at 1.66% CuEq at Asslebyn.

  2. GreenRoc reports 95.2% graphite concentrate from Amitsoq test work

    GreenRoc Strategic Materials plc (AIM: GROC) announced results from processing test work on a representative 300 kg subsample of the 20-tonne bulk sample collected from the Amitsoq graphite project in Greenland. SGS Lakefield in Canada crushed the subsample to less than 3.35 mm, conducted 20 flotation tests and a locked-cycle test, yielding a concentrate grading 95.2 wt.% graphite with overall recovery of more than 90%; the sample's graphite content was determined to be 22.3 wt.%. GreenRoc also signed an agreement with GTK Mintec in Finland to process the full 20-tonne sample, with results including several tonnes of graphite concentrate expected before end of 2026. Phase III drilling, paused through September, is scheduled to resume around 1 October 2026, with the final two holes planned for completion by 16 October 2026.

  3. Sinclair Gold publishes annual report for financial year 2026

    Sinclair Gold (ASX: SGC) announced its annual report for the financial year ended 30 June 2026. The company completed the acquisition of the Mt Henry Gold Project in February 2026, raised A$30 million to accelerate exploration, and rebranded as Sinclair Gold during the period. Mt Henry hosts a JORC (2012) Mineral Resource of 24.5 Mt at 1.2 g/t Au for 915,000 oz Au across the Selene (651,000 oz), Mt Henry (232,000 oz) and North Scotia (12,000 oz) deposits. As at 30 June 2026, approximately 12,300 metres of a planned 50,000-metre programme had been completed, with mineralisation extended 125 metres down-dip at Selene and 150 metres down-dip at Mt Henry. In Sweden, an earn-in agreement was signed over the Falun project, and Medaro Mining Corp. (CSE: MEDA) entered a binding agreement to earn into the Sala project.

  4. Arctic Minerals completes maiden drilling at Hennes Bay with copper in ten holes

    Arctic Minerals AB (First North: ARCT) announced the successful completion of its maiden drilling programme (DP1) at the Hennes Bay copper-silver project in Sweden. Twelve holes totalling 4,187m were drilled, with ten of twelve intersecting visible copper mineralisation in the form of bornite, chalcocite and/or chalcopyrite, including step-out holes up to 600m from historical drilling. Seven of the holes with visible copper were drilled at the Åsnebo, Baldersnäs, Henneviken and Asslebyn prospects — historically drilled to 2,381m — with the objective of providing sufficient data to add these prospects to the current Mineral Resource Estimate (MRE). The existing MRE, based solely on the Dingelvik prospect, totals 55.4 Mt at 1.0% CuEq (0.8% Cu and 20.8 g/t Ag) for 543,000 t CuEq contained metal. Three further holes with visible copper were drilled at Dingelvik with step-outs of up to 500m to the east and south of the existing MRE. Assay results are expected within a month. A second drilling programme (DP2), comprising 20 holes for 8,000m targeting regional anomalies defined by a 2025 MMT survey, has commenced immediately following DP1.

  5. Eclipse Metals to drill 17 holes at Grønnedal rare earth project

    Eclipse Metals (ASX: EPM) announced an agreement for a strategic 17-hole diamond drilling programme comprising 2,355 metres at its 100%-owned Ivigtut–Grønnedal Project in South Greenland, scheduled to commence in October 2026. The programme follows the expansion of the Grønnedal Mineral Resource from 89 Mt to 208 Mt at 0.72% TREO announced on 29 April 2026, which also established its first Indicated component.

  6. FireFox Gold discovers Lammas Zone with 21.0 m at 4.13 g/t Au at Mustajärvi

    FireFox Gold Corp (TSXV: FFOX) announced the discovery of the Lammas Zone at its 100%-owned Mustajärvi Gold Project in Lapland, Finland. Discovery hole 26MJ032 intersected 21.0 m at 4.13 g/t Au from 114.0 m depth, including 1.0 m at 21.6 g/t Au at 118.0 m, followed by 4.2 m at 3.41 g/t Au from 138.0 m, including 1.0 m at 7.22 g/t Au. The Lammas Zone lies approximately 750 to 950 metres east-southeast of the East Zone, more than 650 m from any previous drilling, and is interpreted as a separate splay within the broader Mustajärvi Shear Zone system.

  7. FireFox Gold extends Northeast and Central Zones at Mustajärvi with high-grade intercepts

    FireFox Gold Corp. (TSXV: FFOX) reported assay results from seven drill holes completed at its 100%-owned Mustajärvi Gold Project in Lapland, Finland, extending mineralisation at both the Northeast Zone and Central Zone.

  8. District Metals completes inaugural drilling at Alum Shale Properties in Sweden

    District Metals Corp. (TSXV: DMX) announced the completion of its inaugural diamond drilling programme at the Österkälen and Malgomaj mineral licences, part of the company's 100% owned Alum Shale Properties in central Sweden. A combined 1,943 m was drilled across 15 holes — 787 m in seven holes at Österkälen and 1,156 m in eight holes at Malgomaj — with all 15 holes intersecting graphitic black shale interpreted to represent Alum Shale. Three additional holes at Malgomaj nr 1002 were abandoned due to unconsolidated and weathered bedrock.

  9. GreenRoc extends Amitsoq graphite mineralisation 100–150 m north

    GreenRoc Strategic Materials (AIM: GROC) announced preliminary results from Phase III drilling at the Amitsoq Graphite project in South Greenland, with step-out holes from Pad 3 extending known graphite mineralisation 100–150 m to the north of previous resource drilling. Key intersections from Pad 3 include AM_DD_043, with an estimated true thickness of 21.4 m of the Lower Graphite Layer (LGL) from 137.30–162.48 m, and AM_DD_047, with an estimated true thickness of 13.1 m of the LGL from 182.08–204.94 m. Seven holes have now been completed from Pads 1 and 3; the remaining two holes, AM_DD_041 and AM_DD_042, are planned from Pad 2 in October 2026. Sampling for geochemical assay and geotechnical testing is ongoing.

  10. Leading Edge Materials commences five-hole graphite drilling at Woxna

    Leading Edge Materials Corp. (TSXV: LEM) announced it has commenced a first-pass diamond drilling programme at its 100%-owned Woxna Graphite Project in Sweden. The five-hole programme is designed to test whether the Kringeltjärn, Råttjärnamyren and Svartboberget graphite occurrences form part of the same larger regional graphite-bearing system. The hypothesis is supported by a historical drillhole at Svartboberget that intersected a thick sequence of graphite-bearing rock at depth, and by conductive trends identified in Slingram electromagnetic data from the 1980s and 1990s. The company also announced an extension to its non-brokered private placement closing, now expected on or before September 25, 2026, with terms unchanged.