GreenRoc extends Amitsoq graphite mineralisation 100–150 m north
Automated summary Generated from the company's press release. Not investment advice — read the original before acting on it.
GreenRoc Strategic Materials (AIM: GROC) announced preliminary results from Phase III drilling at the Amitsoq Graphite project in South Greenland, with step-out holes from Pad 3 extending known graphite mineralisation 100–150 m to the north of previous resource drilling. Key intersections from Pad 3 include AM_DD_043, with an estimated true thickness of 21.4 m of the Lower Graphite Layer (LGL) from 137.30–162.48 m, and AM_DD_047, with an estimated true thickness of 13.1 m of the LGL from 182.08–204.94 m. Seven holes have now been completed from Pads 1 and 3; the remaining two holes, AM_DD_041 and AM_DD_042, are planned from Pad 2 in October 2026. Sampling for geochemical assay and geotechnical testing is ongoing.
The company also reported that Ursula von der Leyen, President of the European Commission, referenced Amitsoq as "a very important project in the field of the critical raw materials" during a speech in Nuuk in which she announced a €200 million Global Gateway Partnership Package for Greenland covering critical raw materials, among other sectors. A Prefeasibility Study is expected to start by the end of 2026.
Read the original press release Published 9 Sep 2026
Source: investegate.co.uk — read the original



