Project

Vargbäcken K nr 1

Operated by Botnia Gold AB Major

Vargbäcken is Botnia Gold’s second gold deposit: about 500 metres long, 200 metres deep and 30 to 40 metres wide, in gold-bearing quartz veins the company says remain open at depth. It is held under a granted processing concession with a legally binding environmental permit, and carries indicated resources of 1.37 Mt at 1.44 g/t gold and inferred resources of 0.65 Mt at 1.70 g/t.

Drilling programmes

Past programmes

  1. Apr 2026 Botnia Gold AB — Vargbäcken 2026 drilling — 2,071 m drilled
    Spring 2026 core drilling at Vargbäcken, 17 holes; results reported 28 Oct 2026.

Project facts

Commodity
Au
Region
Västerbotten
Permit / licence type
Bearbetningskoncession Vargbäcken K nr 1, valid to 13 October 2028
Project page
www.botniagold.com